Temporary Scaffolding
NRG Gilbert Generation Station
Milford, NJ
Stephens Associates Consulting Engineers (SA) performed rapid on-site response for this 50-ft. tall temporary scaffolding, erected for renovations to existing electric power generating station.
SA observed, measured, and documented the scaffold's as-built configuration, then evaluated the structural capacity of the temporary scaffolding to support construction-related point loads imposed by heavy pipe bundles.
SA consulted on modifications to the scaffolding needed to support the proposed loads, and prepared as-built drawings of the scaffolding, while meeting the client's tight construction schedule.